Avoid repeating the exponential search for odd orders at least nine. Search the even predecessor, translate its row-major placements to the enlarged board, and tile the new border.
Keep direct search and construction explicit so benchmarks can report their costs separately. Verify the routed order-9 result independently and require its search counters to match order 8.
Tests: Release, Debug, ASan and UBSan CTest (8 passed each)
Refs: #6
Check the character in the output string instead of referring to a nonexistent grid_ member. This restores Debug compilation while preserving the intended invariant that rendering must not write an identical character twice.
Size labels intentionally replace interior spaces, so requiring an entirely unwritten destination would reject valid solutions. Update the testing notes now that Debug builds pass.
Tests: Debug and Release CTest suites (4 passed each)
Refs: #7
Exercise Results::output() with the known order-8 fixture so Debug builds compile and run the rendering assertions. Check the output dimensions and ensure the valid tiling leaves no unrendered cells.
The test passes in Release and currently fails to compile in Debug because Results::set() refers to the nonexistent grid_ member.
Refs: #7
Establish a CTest harness before changing solver behavior. Validate board dimensions, multiplicities, bounds, overlap and coverage against independent placement data, including known order-8 and constructed order-9 fixtures.
Document Debug and sanitizer workflows while keeping the defects tracked by #7 and #14 separate. Prepare a result adapter so the feasible solver regression can be enabled with the completion fix.
Tests: Release, ASan and UBSan CTest suites (3 passed each)
Refs: #1